For your areas with concrete slab engineered wood will be your best bet.
Before the new wood floor on concrete slab.
Homes built on concrete slabs are good candidates for solid wood flooring provided that the slab does not wick up too much moisture.
For a standard four inch thick concrete slab this takes four to five months to happen naturally.
Before installing any wood floor over concrete you ll need a moisture barrier.
If tests indicate too much moisture is in the slab do not install hardwood floors.
The slab can be tested to check the moisture levels and determine whether there is too much moisture to install the subfloor.
The top layer is made from hardwood.
The concrete slab needs to be dry before any flooring can be installed.
How to put a wood floor on concrete.
Too much humidity is most likely to be a problem for a newly installed slab but it could also be an issue for existing slabs too.
Follow these steps with care to safely complete the installation yourself.
Concrete slabs whether new or existing must be dry before the subfloor is installed.
It will extend up the wall for about 2 to 3 inches creating a bowl where your wood floor stays dry and protected.
Amazing installing faucet h sink new bathroom i 0d inspiring installing elegant laying bathroom floor tiles via.
If a floor plank and underlayment or adhesive will not fit under the door remove the door and trim it with a.
19 clever laying tile on concrete slab peritile description.
Wood floor finishes pin by harbour hardwood floors on wood floors pinterest via.
New concrete releases water vapor as it dries.
Humid conditions such as.
Will not fit under the door casing cut the casing with a backsaw about 1 16 inch above the level of the new flooring.
Whether you re planning on renting out your home or looking to increase its value using concrete as a base is a great idea.
Before you look at any flooring options for basements or wetter areas all moisture has to be controlled.
When you install hardwood floors concrete is one of the best bases to work from there are only a few steps to take.
Watch this video to see how easy it is.
Engineered hardwood flooring is made from a high quality plywood.
Therefore it s important to allow concrete to dry out before you install flooring on a newly poured slab.
Learn how to prepare a concrete subfloor for hardwood or laminate flooring.
If it s left uncovered water vapor can rise through the slab and evaporate away at the surface.